AFTER-ACTION REPORT

OPERATION YASHIMA

NERV TACTICAL OPERATIONS DIVISION — DOCUMENT REF: AAR-2015-006

CLASSIFIED
status
APPROVED
Report IDAAR-2015-006
Date2015.06.12 — 04:32 JST
ClassificationLEVEL-4 RESTRICTED
Authorizing OfficerKATSURAGI, M.
Unit DeployedEVA-01 TEST TYPE
PilotIKARI, SHINJI
Duration00:12:47 (ACTIVE)
LocationMT. FUTAGO — SECTOR 7G
OPERATION YASHIMA — TACTICAL SUMMARY

At 23:45 JST, 5th Angel RAMIEL was confirmed stationary above the GeoFront access shaft, deploying a high-energy particle beam to bore through 22 armor layers. MAGI consensus classified the threat as ALPHA-PRIORITY. Commander Ikari authorized Operation Yashima: a long-range positron sniper engagement utilizing the entire electrical output of Japan.

EVA-01 was deployed to Mt. Futago with a prototype positron rifle adapted from the JSSDF's strategic self-defense arsenal. EVA-00 was assigned shield duty using a re-purposed SDF shuttle heat shield. Power was routed via emergency protocols from all sectors of the Japanese power grid. Civilian evacuation of the surrounding 50km radius was completed at 23:12 JST.

First shot at 00:04 JST refracted off RAMIEL's AT Field. The Angel immediately returned fire, inflicting critical damage to EVA-00's shield assembly. Second shot at 00:07 JST achieved direct core penetration. RAMIEL ceased all activity at 00:07:22 JST. Angel confirmed neutralized by MAGI at 00:08:01 JST. EVA-00 pilot Ayanami recovered from entry plug in critical condition. Operation declared successful.

MISSION COSTS9 ENTRIES
#ITEMCATEGORYQTYUNIT COST (¥M)TOTAL (¥M)
001Positron Rifle chargesORDNANCE812.5100.0
002LCL consumptionBIOLOGICAL42000.00312.6
003Power cable replacement (set)LOGISTICS28.016.0
004External battery packsPOWER645.0270.0
005Structural repair — left pylonREPAIR1340.0340.0
006Armor plate replacement — torsoREPAIR1185.0185.0
007Personnel overtime (hours)PERSONNEL14800.00811.8
008Civilian evacuation operationsLOGISTICS152.052.0
009Infrastructure damage assessmentADMIN13.23.2
ROWS: 9
TOTAL EXPENDITURE¥990.6M
EVA-01 STRUCTURAL INTEGRITYPOST-OPERATION STATUS — LEFT PYLON COMPROMISED
CRITICALDEGRADEDOPERATIONALNOMINAL
0255075100
PILOT NEURAL CONTAMINATIONIKARI, S. — SYNC RATIO DEVIATION WITHIN TOLERANCE
SAFEELEVATEDHAZARDOUSCRITICAL
0255075100
status
REVIEWED

Tactical Operations Review

KATSURAGI, Misato — Capt.

2015.06.12 — 06:15 JST

status
APPROVED

Commander Authorization

IKARI, Gendo — Cmdr.

2015.06.12 — 08:00 JST